Inside KSC News Feeds
06-08-2008, 03:57 PM
With all scheduled spacewalk tasks complete, both spacewalkers are performing so-called "get-ahead" activities. Mike Fossum is installing thermal covers over connectors outside the Harmony node. Garan will move to the right hand Solar Alpha Rotary Joint, or SARJ, and remove launch restraints.